Last Week in Environmental Impact Statements: Village at Wolf Creek

Photo by dalliedee. Some rights reserved.

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).

We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

*UPDATE: Starting October 1, 2012, EPA will not accept paper copies or CDs of EISs for filing purposes. All submissions on or after October 1, 2012 must be made through e-NEPA. Electronic submission does not change requirements for distribution of EISs for public review and comment. To begin using e-NEPA, you must first register with EPA’s electronic reporting site—https://cdx.epa.gov/epa_home.asp*

* * *

EIS No. 20120264, Final EIS, USFS, CA, On Top Hazardous Fuels Reduction Project, To Disclose the Environmental Effects of a Federal Proposal on National Forest System (NFS) Land, Plumas National Forest, Feather River Ranger District, Plumas, Butte Counties, CA, Review Period Ends: 09/17/2012, Contact: Carol Spinos 530-534-6500. Website.

EIS No. 20120265, Draft EIS (about halfway down the page), FHWA, MT, Billings Bypass Improvements, Connecting Interstate 90 (I-90) east of Billings with Old Highway (Old Hwy 312), Possible USACE Section 10 and 404 Permits, Yellowstone County, MT, Comment Period Ends: 10/01/2012, Contact: Brian Hasselbach 406-441-3908. Website.

EIS No. 20120266, Draft EIS, USFS, CO, Village at Wolf Creek Access Project, Conveyance of Non-Federal Land to the U.S. in Exchange for National Forest System Lands Managed by the Rio Grande National Forest, Mineral County, CO, Comment Period Ends: 10/01/2012, Contact: Harold Dyer 719-852-6215. Website.

EIS No. 20120267, Draft EIS, USN, VA, Outdoor Research, Development, Test and Evaluation Activities within the Potomac River Test Range and Explosives Experimental Area Complexes, the Mission Area and Special-Use Airspace at Naval Support Facility Dahlgren, Expansion, Dahlgren, VA, Comment Period Ends: 10/01/2012, Contact: Jennifer Boyd 540-653-8695. Website.

AMENDED NOTICES

EIS No. 20120184, Draft EIS, NOAA, 00, Issuing Annual Quotas to the Alaska Eskimo Whaling Commission (AEWC) for a Subsistence Hunt on Bowhead Whales for the Years 2013 through 2017/2018, Comment Period Ends: 08/31/2012, Contact: Ellen Sebastian 907-586-7247 Revision to FR Notice Published 06/15/2012; Extending Comment Period from 08/14/2012 to 08/31/2012. Website.

EIS No. 20120197, Draft EIS, USFS, ID, Golden Hand No. 1 and No. 2 Lode Mining Claims Project, Krassel Ranger District, Payette National Forest, Valley and Idaho Counties, ID, Comment Period Ends: 08/13/2012, Contact: Jeff Hunteman 208-634-0434 Revision to FR Notice Published 06/29/2012; Extending Comments Period from 08/13/2012 to 09/17/2012. Website.

EIS No. 20120263, Final EIS (about halfway down the page), USFS, CA, Barren Ridge Renewable Transmission Project, Construct, Operate, Maintain, and Upgrade 220kV Electrical Transmission Lines and Switching Stations, Kern and Los Angeles Counties, CA, Review Period Ends: 09/10/2012, Contact: Justin Seastrand 626-574-5278(AFS), Lynette Elser 951-697-5233(BLM) Revision to FR Notice Published 08/10/2012; Review Period ends 09/10/212. Website.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 226 other followers

%d bloggers like this: